First use: Before using the equipment, you need to disconnect the purge air source pipe at the front of the equipment and perform air blowing operation.
This is to clean the water vapor, iron filings, oil stains, raw material tape and other possible impurities in the air pipe. These impurities will cause damage
to the equipment. equipment has a serious impact. The ideal purge time is 10 seconds per meter.
Purge time: The ventilation replacement amount specified in explosion-proof zone 2 is 5 times the motor volume, and the ventilation replacement amount
specified in explosion-proof zone 1 is 10 times the motor volume.
The calculation method is: motor length (decimeter) * width (decimeter) * height (decimeter) * coefficient (the second zone is 5, the first zone is 10) -
rotor volume (cubic decimeter) = purge volume (liter)
Purge volume (L)/flow orifice plate (NL/min) = time (min)
- Products
- Motor Purge Systems
- Enclosure Purge Systems
- Hazardous area label printers
- Room Pressurization Systems
- Nitrogen Buffer Systems
- EPS Environmental Protection System
- Accessory
- Enclosure Purge Systems
- Projects
- Motor Purging System
- Enclosure purge system
- Room Pressurization Systems
- Nitrogen Buffer Systems
- Ex p Solution for Robot Arm
- Accessory
- News
- Celebrating the 70th anniversary of EXPO - Asia Pacific Celebration and product knowledge training was held in Qingdao
- Friendly Reminders and Required Compliance
- Comer Mechanical and Electrical 2024 Yangzhou group construction tour
- EXITING THE EUROPEAN UNION SANCTIONS
- Bribery Act 2010 2010 CHAPTER 23